City of Greeley Press Releases

23rd Avenue Stormwater Pipe Replacement

Release Date:
Jan 6, 2017

For Immediate Release
Heather Seitz, Civil Engineer
970-336-4031
Heather.Seitz@greeleygov.com

IMG_2544WEB

The City of Greeley will be replacing a stormwater pipe on 23rd Avenue near the Highway 34 Bypass.  The project is planned to begin on January 9, although this date is dependent on weather and other factors. Construction is expected to last about 28 days.  One lane in each direction will be open at all times. 

The condition of the drainage system is in poor condition and is in need of repair.  In the summer of 2015, the failing stormwater pipes caused a sinkhole in 23rd Avenue.

Visit OperationRainDrain.com  to keep informed about this and other projects to improve drainage and reduce flooding issues.

###

Contact Us

Communications and Engagement

1000 10th Street, Lower Level
Greeley, CO 80631

Monday - Friday
8:00 a.m. to 5:00 p.m.

970-350-9702

Greeley Unexpected

GTV8

Privacy and Security | ADA Policy | Contact Us | © City of Greeley 1000 10th Street Greeley, Colorado 80631 all rights reserved